    Availability Estimation of Power Generating Units at Nalubaale Power Station.

    Thumbnail
    View/Open
    Master's Thesis (1.753Mb)
    Date
    2023-01
    Author
    Lubwama, Emmanuel Gyavira
    Metadata
    Show full item record
    Abstract
    The main aim of an electric power system is to reliably provide electrical power supply to customers. However, in 2020, Uganda’s grid experienced an average of 62.4% forced outages. The forced outages due to generator failures led to a loss of 20.36GWh. Such failures during peak time can cascade into blackouts affecting plant availability. Therefore, it is important to estimate the availability of units and forecast their production to ensure continuity of power supply to the grid. As such, the objective of this research was to develop computational methods for availability estimation with a case study of Nalubaale Power Station (NPS).􀀃 First, the generation and outage trends for power generating units at NPS were analysed. NPS was observed to run as a base load power plant with an average and maximum dispatch of 96.66MW and 145.3MW respectively. Then, a model was developed for availability estimation of NPS units using the Bootstrap Monte Carlo Simulation (BMCS) method. The model provided acceptable results as an approximate method with a Mean Square Error (MSE) as low as 0.001 for Unit 2 and the highest MSE of 0.092 for Unit 9. Based on the results, a merit order for dispatch of the units was formed; First Unit 1, then 4, 8, 5, 7, 2 and 9 as the last unit to be synchronized. Lastly, a model for forecasting hydro power electricity generation was developed using Long-Short Term Memory (LSTM) Machine Learning (ML) technique. The model achieved an MSE of 0.0067. The model makes an hour ahead prediction based on 24-hour historical data for the turbine discharge and head. From the results of this study, Eskom Uganda Limited (EUL) and other concessionaries running other hydro power stations should adopt the BMCS model developed for availability estimation of their generating units. Results from this model will aid in deciding whether to retain or acquire a new generator system and in determining a merit order of units. Furthermore, Uganda Electricity Transmission Company Limited (UETCL) should change the requirement in Power Purchase Agreements (PPAs) for hydro power stations to declare their available capacity mainly based on power generation forecast instead of expected planned outages. This process could utilize the LSTM model developed in the study. Overall, the proposed approach provides a more accurate availability estimate that can aid in power system planning and maintenance.
    URI
    http://hdl.handle.net/10570/11649
    Collections
    • School of Engineering (SEng.) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV