• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Implementation of quality management practices in road construction projects - case study of KIBP Project, Namanve

    Thumbnail
    View/Open
    Master's Research Report (13.43Mb)
    Date
    2024-12-12
    Author
    Kasimo, Chrispus
    Metadata
    Show full item record
    Abstract
    The development of crucial infrastructure, including road networks, electricity grids, and industrial parks, plays a key role in driving economic growth, usually evidenced by increased GDP. The Kampala Industrial Business Park (KIBP), designed/planned to accommodate various industrial and commercial activities (SMEs), was initiated by the Ugandan government through Uganda Investment Authority (UIA), with LaganDOTT Namanve Limited entrusted to implement the project in an EPC contract. This study aimed to assess the extent of implementation of quality management practices within the KIBP project, focusing on quality implementation measures (QA/QC), conformance to designs and specifications, and challenges encountered. Utilizing explanatory research, the study primarily relied on secondary data obtained through document reviews and supplemented with primary data from field observations. Various documents were scrutinized, including contracts, quality assurance plans, design reports, and progress reports. The findings revealed the adoption of QA/QC practices by the KIBP project to meet project objectives, although with challenges such as workforce turnover, low wages, poor communication, and planning issues identified. Recommendations were suggested to address these barriers, emphasizing proper scheduling, communication channels, skilled workforce recruitment, improved remunerations, welfare and capacity building through training. By addressing these challenges and fostering stakeholder engagement, the KIBP project can navigate quality management complexities more effectively, contributing to its success and Uganda's economic advancement.
    URI
    http://hdl.handle.net/10570/14025
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV